Door Schedule: What Goes in It, Examples, Free Templates and an IFC Schedule Maker

A door schedule is the table in a set of construction drawings that lists every door in the building, one row per door, with its number, room, size, type, material, frame, fire rating and hardware set. The number on each door tag on the floor plan points to one row. A window schedule does the same for windows, usually by type, with sizes, sill heights, operation and energy ratings.
Our articles are still written by humans!
Get human written articles in your Google feed.
This guide goes through every column of a door, window and room finish schedule, how doors get their numbers, what the fire rating column means, and real examples from architects' sets. It has free XLSX templates and a free schedule maker that reads an IFC model and fills the three schedules for you, plus what we found when we ran it over 19 real IFC files from Revit, Archicad and other tools.
Free door and window schedule maker
Drop an IFC file from Revit, Archicad, Vectorworks, Bonsai, AIBIMTool or any other BIM tool, or try the sample (buildingSMART's Duplex Apartment, exported from Revit). Every IfcDoor, IfcWindow and IfcSpace becomes a row you can edit. The file is read in your browser with web-ifc and never uploaded. No model? Start blank and type; the exports are the same.
Drop an IFC model here
Every IfcDoor, IfcWindow and IfcSpace becomes a row: mark, level, room, size, sill, operation, fire rating, U-factor and finishes, with what the file leaves out marked. Revit, Archicad, Vectorworks, Bonsai and AIBIMTool exports; IFC2x3, IFC4 and .ifcZIP.
The file is read in your browser and never uploaded
No model? “Start blank” gives you the same tables to type into, with the same exports.
Values the file states are shown as they are. Values it does not state, but that the tool could work out, are in italics with a blue ≈: sizes measured from the 3D geometry (they include the frame, so they run an inch or two large), rooms found by testing a point on each side of the opening against the room shapes, and "exterior" inferred from a room on one side only. A yellow ! marks rows that look wrong in the file, such as a door 7'-5" wide and 3'-1" high. Number by room gives doors the number of the room they serve (101, 101A, 101B), and Letter by type gives windows one letter per type and size.
The XLSX has the door, window and room finish schedules on separate sheets, a type summary for doors and windows, and empty columns for what IFC files rarely carry: door thickness, frame type, hardware set, glazing and SHGC. It prints landscape on Letter with the header repeated on every page. The DXF table is lines and text at plotted size (3/32" text) to paste onto a sheet in AutoCAD or BricsCAD.
Free templates
If you would rather fill a spreadsheet by hand, these are blank, with two grey example rows each, free to use and share (CC0):
They open in Excel, Google Sheets, Numbers and LibreOffice.
What a door schedule is
A door schedule is a contract document. The contractor prices and orders doors from it, the door and hardware supplier builds its submittal from it, and the inspector checks rated doors against it. It sits with the other schedules, in the US on the A-600 series of sheets (sheet type 6 in the National CAD Standard's Uniform Drawing System is "Schedules and Diagrams"), or on the floor plan sheet in a small set. Next to it are the door type elevations (A, B, C: flush, half glass, full glass, pair) and the frame type elevations that its columns point to.
The term has a second life in building security, where a "door schedule" is the time window in which an access control system keeps a door unlocked. That one is set in software such as Verkada or Brivo and has nothing to do with drawings.
Door schedule columns, one by one
There is no single mandatory format, but almost every US set carries these columns, left to right:
| Column | What goes in it | Example | Where an IFC file keeps it |
|---|---|---|---|
| Mark (door number) | The unique number on the plan tag | 101A | Revit: Mark in the Revit property sets; Archicad: Element ID |
| Room / location | The room the door serves, or both rooms | 101 Office | Space boundaries, or the rooms on each side |
| Width × height × thickness | Leaf size, nominal | 3'-0" × 7'-0" × 1-3/4" | IfcDoor.OverallWidth and OverallHeight; thickness rarely |
| Door type | Letter keyed to the door elevations | A (flush) | Type name or Type Mark |
| Material and finish | Leaf material and finish | Solid core wood, stained | IfcMaterial on the door or its type |
| Operation | Swing, handing, pair, sliding | Single swing, right | OperationType on the door (IFC4) or its style (IFC2x3) |
| Frame type and material | Letter keyed to frame elevations; frame material | F1, hollow metal | Rarely exported |
| Fire rating | Required rating of the door assembly | 20 min, 90 min | Pset_DoorCommon.FireRating |
| Hardware set | Number of the set in the hardware schedule | HW-3 | Almost never exported |
| Remarks | Glazing, closer, smoke seals, card reader, undercut | Smoke gasket | Free text |
A few columns deserve a note.
Size. The schedule lists the nominal leaf size, not the clear opening. Commercial doors are mostly 3'-0" × 7'-0" × 1-3/4"; houses use 2'-6", 2'-8", 2'-10" and 3'-0" leaves at 6'-8" high and 1-3/8" thick for interior doors. Accessibility is about the clear width, which the 2010 ADA Standards (404.2.3) set at 32 inches minimum, measured between the face of the door and the stop with the door open 90 degrees. The door's own thickness and the stop take roughly 2-1/2 inches off the leaf, which is why commercial doors are 3'-0" and not 2'-10".
Operation and handing. Handing (left or right) is read from the side the door swings toward, and offices disagree on which side that is, so many schedules leave handing to the hardware supplier and show the swing on the plan only.
Hardware set. The door schedule does not list hinges and closers. It gives each door a set number, and the hardware schedule says what is in each set, in the order of the Door and Hardware Institute's Sequence and Format for the Hardware Schedule. A 300-door office building may need only 20 sets.
The fire rating column
The fire rating column states the minimum rating of the whole door assembly (door, frame and hardware), in minutes or hours, as required by the wall the door sits in. The door's rating is usually lower than the wall's, because there is less to burn next to a door. Three cases cover most buildings:
| Wall the door is in | Wall rating | Door rating | Source |
|---|---|---|---|
| Corridor wall (fire partition) | 1 hour or 1/2 hour | 20 minutes | IBC Table 716.1(2), as summarized by Lori Greene at iDigHardware |
| Exit stair enclosure, 4 or more stories | 2 hours | 1-1/2 hours | IBC Table 716.1(2), as summarized by Glass Magazine |
| Exit stair enclosure, fewer than 4 stories | 1 hour | 1 hour | Same |
Check the edition your jurisdiction adopted; the table has changed between editions. A 20-minute corridor door may be tested without the hose stream test, and it needs a smoke and draft seal, which is why "S" or "smoke gasket" shows up in the remarks column.
European models write ratings in EN 13501-2 notation, and one of the files in our test did: EI 60 S is 60 minutes of integrity (E) and insulation (I) with smoke control (S), and a C adds self-closing. The Norwegian school in our sample had 88 rated doors written that way, from E 30 to EI 60 CS.
How doors are numbered
The usual US convention: a door takes the number of the room it opens into, and a room with more than one door gets letters, 101A, 101B. Corridors and lobbies do not lend their numbers, so a door between corridor 100 and office 101 is 101. The point is that a door number tells you where the door is without looking at a key plan. The alternative, common on large projects and in Europe, is a running number per floor (D101, D102) or room number plus a sequence (Norway: 03100.1).
The schedule maker's Number by room does the US version. It cannot know the swing, so it picks the room on either side that is not a corridor, hall, lobby or stair, and of two rooms the smaller one. We checked it against the marks architects gave three Revit models: it gave the same number to all 14 doors of the Duplex Apartment, to 77 of 102 doors in Office A (86 had the same room number with a different letter), and to 171 of 254 doors in the Medical-Dental Clinic (210 with the same room number). Where it disagrees, the architect had numbered a door between two offices after the other office, or a vestibule door after the vestibule. Read the result as a first pass.
Window schedule
A window schedule usually lists window types, not every window, because a building has many identical windows. The type letter appears on the plans and elevations. Typical columns:
| Column | What goes in it | Example |
|---|---|---|
| Type mark | Letter or number per type and size | A |
| Size | Unit size or rough opening (say which) | 4'-0" × 5'-0" |
| Sill and head height | Above finished floor | Sill 3'-0", head 8'-0" |
| Operation | Fixed, casement, awning, hopper, double-hung, slider | Casement, left |
| Frame | Material and finish | Aluminum, thermally broken |
| Glazing | Insulating unit, coatings, tempered or laminated | 1" IGU, low-e |
| U-factor and SHGC | NFRC-rated whole-window values | U-0.30, SHGC 0.25 |
| Remarks | Tempered, emergency escape, screens | Tempered |
The U-factor and SHGC are what the energy code checks. Under the 2021 IECC prescriptive path for homes, windows need a U-factor of 0.30 or lower in climate zones 3 through 8, with a few exceptions at high elevation, and an SHGC of 0.25 or lower in zones 1 to 3 (PNNL's table of IECC fenestration requirements). Our wall section guide does the same check for the opaque wall around the window.
Emergency escape. In a house, every sleeping room needs one emergency escape and rescue opening. Under the 2021 IRC (R310.2.1 and R310.2.2) it must give a net clear opening of at least 5.7 square feet (5.0 at a grade floor), at least 24 inches high and 20 inches wide (Washington State's 2021 IRC tip sheet). A window schedule marks those windows, because the clear opening of a casement is not its rough opening.
Safety glazing. Glass next to doors, in tubs and showers and in large low panes is a hazardous location under IRC R308.4 and needs tempered or laminated glass; the remarks column is where it goes.
Room finish schedule
The room finish schedule lists every room by number and name, with the finish of the floor, the base, each wall and the ceiling, and often the ceiling height. Finishes are written as codes (CPT-1, RB-1, PT-2, ACT-1) that point to a finish legend or to the specification, so the schedule stays readable and a product change is made in one place. Walls are sometimes split into north, east, south and west when one wall differs, such as an accent wall or tile to 4 feet in a toilet.
In IFC, finishes are the weak point. Revit has Floor Finish, Base Finish, Wall Finish and Ceiling Finish parameters on rooms, and they reach the IFC with the Revit property sets, but of our 19 models only one had them filled: the Norwegian school, with finishes on 280 of its 307 rooms. One Archicad file had the fields, with the placeholder text "<Floor Finish>" in every room. The schedule maker lists rooms with their number, name, level and area, and leaves the finishes for you to type.
What 19 real IFC files put in a schedule
To see how much of a schedule a BIM model can fill, we ran the schedule maker's reader over 19 architectural IFC models: buildingSMART's public sample files, the test models of web-ifc, two Revit IFC4 samples, and one model from our own AIBIMTool generator. Together they hold 3,121 doors, 2,677 windows and 1,424 rooms, exported from Revit 2011 to 2022, Archicad 18 to 25, a Rhino plug-in and AIBIMTool. The full per-file results are in this CSV.
What 19 IFC models put in a door schedule. Our test, November 2026.
What we found:
- Sizes are almost always there. 2,980 of 3,121 doors (95 percent) carried OverallWidth and OverallHeight. The exceptions were the Rhino plug-in export, half of the Schependomlaan doors, and our own AIBIMTool model, which writes no door sizes at all. The tool measured those from the geometry.
- Door numbers often are not. Only 7 of the 19 models had a unique mark on every door (or all but a handful), which covers 735 doors, 24 percent. Seven had none, including five exports from Revit 2019 to 2022: in Revit the Mark lives in the "Identity Data" group, which reaches the IFC only when "Export Revit property sets" is ticked in the export setup. Five Archicad files had an ID on every door, but it was a type code: one Danish house had the same ID, a classification code, on all 119 doors.
- Fire ratings are rare. Only 3 models had any, on 213 doors (7 percent). Old Revit exports even wrote the parameter name as the value, FireRating = "Fire Rating", on every door; the tool treats that as empty.
- Rooms can be found. 14 models had rooms (IfcSpace). In those, 1,288 of 1,457 doors (88 percent) got their rooms: 660 from the space boundaries in the file, 628 from the geometry test.
- Not every IfcDoor is a door. 49 "doors" in the Schependomlaan model were timber subframes, plywood panels and stainless steel trim, modeled as doors so they cut the wall. In the Norwegian school, 10 were roof and access hatches (600 mm and 1 m square) and one was a 9.7 m folding wall, and 6 doors across two Revit models had width and height swapped (one written as 2.27 m wide and 0.95 m high). The tool flags those rows.
- Window energy data is patchy. 7 of the 17 models with windows had a U-value on any window.
The conclusion for practice: a model gives you the quantities, sizes, levels and rooms for free, and the tool saves the retyping. The marks, fire ratings, frame types and hardware sets are design decisions that someone still has to make, and in most files nobody had put them in the model. If you want them to travel with the model, add them in the authoring tool, or open the IFC in the free IFC editor and write Pset_DoorCommon.FireRating and a mark onto the doors before you hand it on. Our own generator failing the size test is on our list.
Door schedule examples
A door schedule from an office fit-out in Brisbane, issued for construction in October 2024. There are only three doors, so the sheet has room for each one in elevation above the table, with dimensions to the glazing and the decals. The columns go further than most: locking, furniture (Australian for door hardware) and accessories are written out in full rather than given a hardware set number, which works for three doors and would not for three hundred.
Three doors, each with its elevation, and the hardware written out in full in the locking and furniture columns. Reference: Office Fitout Construction Documentation by Chalee Johnston on Behance.
The opposite case is a US commercial floor. The 4th floor door schedule below has more than 50 doors, numbered by room (401, 402, 410a, 410b), with columns for type, width, height, thickness, rating, material and finish of the door, then type, rating, material and finish of the frame, a hardware column and remarks. Door types A to G are drawn under the table, and a hardware schedule (HW-1 passage set, HW-4 storeroom set, fire rated) sits at the bottom left of the same sheet. Note the abbreviation legend (HM hollow metal, SC solid core, TPR tempered glass): a schedule is only readable with its legend.
A US commercial door schedule numbered by room, with door types drawn below it. Reference: Construction Documents (Commercial) by Ryan Honnet on Behance.
A residential set from East Ham, London, puts the door and window schedules side by side at the top of one sheet, with every door type (D1 to D9) and window type (W1 to W9) drawn at 1:50 below them. The window schedule lists type, count, width, height and sill height, which is the minimum a builder needs to order windows.
Door and window schedules on one sheet, with each type drawn and dimensioned. Reference: Door and Window Schedule by Tesla CAD Solutions on Behance.
A student sheet shows how a small schedule of openings ties to the details: each type (D1 single flush door, D2 double door with glass, W1 double glass window) has its elevation, section and plan detail at 1:16 and 1:4, and the table at the bottom gives length, height, sill, lintel level, type, material and finish.
A schedule of openings with the elevation and details of each type. Reference: Door and Window Schedule by Ashima Chaudhary on Behance.
Making a door schedule in Revit, Archicad or from IFC
In Revit, use View > Schedules > Schedule/Quantities, pick the Doors category, and add the fields Mark, Level, From Room: Number, To Room: Number, Width, Height, Thickness, Type Mark, Fire Rating, Frame Type and Comments. Sort by Level, then Mark. For a door type schedule, untick "Itemize every instance" and add Count. From Room and To Room come from the way each door faces, so a door flipped the wrong way swaps them; check a few before issuing. Revit's room finish parameters fill a room finish schedule the same way, from the Rooms category. To keep the marks when you export to IFC, tick "Export Revit property sets" on the Property Sets tab of the IFC export setup (Autodesk's export options).
In Archicad, the Interactive Schedule (Document > Schedules and Lists) has ready schemes for doors and windows. The Element ID is what appears in the door tag, so give each door its own ID if the schedule is to have one row per door; the files in our test show many offices use the ID for the type instead.
From an IFC model, use the schedule maker above. It works for files from any tool, which is the common case for a consultant, a contractor or a door supplier who receives a model rather than a Revit file. For a quick look at the model first, the free IFC viewer opens it in the browser. To understand what an IFC file holds and how it is organized, see what an IFC file is.
By hand, take the template, list doors floor by floor from the plans, and number them as you go. A spreadsheet is fine for a house; past a few dozen doors, the schedule is better generated from a model, because doors added late are the ones that get missed.
For where schedules sit among the other sheets of a construction set, see architectural drawings.
Frequently asked questions
What is a door schedule?
A door schedule is a table in a construction drawing set that lists every door in the building, one row per door, keyed to the door number (mark) shown on the floor plans. Each row gives the door's room, size (width, height and thickness), door type, material and finish, frame type, fire rating, hardware set and remarks. The contractor and the door supplier order and install doors from it.
What is the difference between a door schedule and a hardware schedule?
The door schedule lists doors and gives each one a hardware set number, such as HW-3. The hardware schedule, usually written by a hardware consultant or supplier, lists what is in each set: hinges, lockset, closer, stops, seals and so on, in the order of the Door and Hardware Institute's Sequence and Format. Many doors share one set, so the two tables stay short.
How are doors numbered on a floor plan?
The common US practice gives each door the number of the room it opens into, so the door into room 101 is 101, and a room with several doors gets 101A, 101B and so on. Some offices number doors in sequence per floor instead (D101, D102). Whatever the system, each door has one unique mark, and the mark on the plan tag matches one row of the door schedule.
What is included in a window schedule?
A window schedule usually lists window types rather than every window: a type letter or number, the unit size or rough opening, sill or head height, operation (fixed, casement, awning, double-hung, slider), frame material, glazing, the NFRC-rated U-factor and SHGC, and remarks such as tempered glass or emergency escape. Each window on the plans and elevations carries its type tag.
Can you get a door schedule from an IFC file?
Partly. In our test of 19 real IFC models, 95 percent of 3,121 doors carried their width and height, but only 7 of the 19 models had a unique number on every door, and only 3 had any fire ratings. A schedule maker can read what is there, measure what is missing from the geometry and find the rooms on each side, but marks, fire ratings and hardware sets usually have to be added by the architect.